Skip to content

Production and logistics building

Location
Goleniów
Timeline
2021-2022
Sector
Industrial
Area
11,000 m²

About the project

The design of the manufacturing and logistics building for LCube, with a floor area of approximately 11 000 sq. m. ADC was involved in conceptual and building design and administrative procedures, including obtaining a building permit.

Timeline

2021-2022

Production and logistics building
1 of 5