Skip to content

Hotel renovation

Location
Karpacz
Timeline
2019-2020
Sector
Hotels
Area
3,200 m²

About the project

This project aimed to revitalize and redevelop the rooms and common areas of the 1970s hotel building. The main design challenge was to introduce new hotel standards and change the functional layout in the existing structure. ADC provided the latest technical and fire-prevention expertise.

Timeline

2019-2020

Hotel renovation
1 of 7