The expansion of BALL PACKAGING EUROPE's aluminum can plant in Lublin has come to an end.
Thanks to efficient organization, the general contractor (WARBUD) went through official acceptance and obtained an occupancy permit.
The ADC team acted as the Investor's Supervision Inspector. The production facility expanded by 12,760m2.
The scope of the project included the construction of a new production hall with three connectors to the existing building, equipping it with the necessary sanitary, electrical, teletechnical installations and technology.
New parking spaces were created, along with the necessary infrastructure and a storage area for recycling. Interesting fact - thanks to the expansion, the plant will double its production capacity.